About Us | HUB Certificate | Our President | City Plan Review | Contact Us
   
Design And Construction Period Services
 
Plan Review Fees

 

Plan Review Check List

 

Plan Review Submittal Form

 

Code Analysis

 

Helpful Tools
 

 

Do You Need An Expert Witness?
 
 
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Plan Review Checklist

  • 4 Plans (with Date) – 4 Equipment submittals and calculations

    *IF WE HAVE TO MAKE COPIES, THERE WILL BE A $50 CHARGE

    * A brief description of the system design, and operation

    * Manufacture’s product information sheet that includes design parameters, and power requirements – Use arrow to identify the model or part

    * 4 hydraulic calculations

    * Battery size calculations

    * Voltage Drop Calculations

    * Riser Diagram

    * Draw plans to scale. Identify use of each room (Minimum Scale 1/8”)

    * Circuit wiring from device to device and/or device tags (include ckt#/device#) shall be indicated on plans including end-of-line resistors

    * List ACR and APS and/or ECR and EPL with original signature on all plans

    * Indicate on plans if any area is not in contract

    * Indicate on plans name and complete address of location

    * Indicated on plans, name, address, fax and phone number of the contracting fire alarm company

    * Indicate on plans what year the building was constructed

    * Indicate on plans what the building occupancy classification is

    * STAPLE EQUIPMENT SUBMITTAL SHEETS TOGETHER AND INCLUDE JOB NAME AND ADDRESS ON COVER

    * Special Requirements for the following Cities:

    Duncanville : Requires a copy of your State License with each submittal

    Southlake: Requires a copy of your State License/City Registration

    Wylie: Requires a copy of your Company License/Drivers License/Notarized Letter of Design Compliance with IFC 2003 with each submittal

     

 
Back To Our Home Page